Quincy, Illinois

Diocese of Springfield in Illinois

St. Peter Catholic Church

Living Stones Ongoing Development of Architectural Concept Drawings:

 

 

 

 

 

 

 

                                                                                    

 

                                                                                                    

   

   

   

Text Box: Fall 2008
Text Box: School – 1st Floor Construction Features
New entrance to school moved to the covered walkway between the main school and gym buildings.  Covered walkway will be enclosed on both sides with entrance to the center courtyard through a secured doorway
New electrical service
New addition with  three classrooms/labs for computers, music, and remedial reading and a storage room
AC in new addition
Current Fourth Grade East Classroom renovated to accommodate relocation of Library from Tolton Hall
Elevator installed for handicapped accessibility
Partial asbestos removal
Additional electrical receptacles and new data wiring in classrooms and offices
New Kindergarten room added to south end of Gymnasium and current South Kindergarten to allow Pre-School Classroom to relocate from Tolton Hall to current North Kindergarten Classroom
Locker rooms in Gym building renovated into Teachers’ Workroom (2/3) and Janitors closet (1/3)
School – 2nd Floor Construction Features
Rooms on east side of the building renovated and reconfigured into three classrooms of equal size
New addition on south end with classrooms for Third Grade students who will be relocated from the lower level of the church building, a Developmental Speech Classroom, a storage area, and a faculty restroom
Deferred maintenance issues
Windows repaired
New electrical receptacles and data wiring
Partial asbestos removal
New roof and insulation 
Two new roof fans for air circulation in existing school building 
Text Box: Church – Main Floor Construction Features
New entrance canopy on west side of church
New handicap access ramp on west side of church
New Gathering Space/Narthex Addition on west side of church
New Adoration Chapel as part of west side addition
New Family Room as part of west side addition
Elevator installed for handicapped accessibility to lower level of church
Two unisex restrooms accessible from both the Gathering Space/Narthex area as well as the Adoration Chapel and Family Chapel
Two additional entrances on the west side into the Gathering Space/Narthex area
A new ushers storage room
A new vestments robing room
Structural renovations to the wall below St. Peter stained glass window
Repairs to the stain glass windows in the church
Handicapped ramp or other accessible means to the sanctuary area
Current Family Chapel converted to Room for Children’s Liturgy of the Word
New air handler for church building
New light controls for the church area
Roof repairs, not replacement to the church roof
Renovation of music liturgy area to be determined
Deferred maintenance issues addressed
Church – Lower Level Construction Features
Asbestos removed from ceiling in Cafeteria Kitchen area
Fire suppression sprinkler system installed in Cafeteria and Kitchen area
Accessible ramp installed at south entrance to lower level
Windows replaced

PSR

Sacraments

Ministries

Quincy Catholic

Community Links

Parish Information

Text Box: What’s not included in
Phase 1 & 2 right now?

Church – Main Floor
Full Immersion Baptismal Font in Church Narthex - $27,223
Terrazzo floor in Church refinished - $30,000
Additional lighting in Church Sanctuary and Choir area - $5,500
New roof on the Church - $160,319
New Organ and Sound System - $200,000+

Church – Lower Level
Lower level renovations to create dedicated funeral dinner space and Sunday School classroom - $145,000
Solarium/Meeting Room Addition - $137,000

School – 1st & 2nd Floors
School corridor and stair renovation - $32,488
Renovation of existing classrooms on first floor and west side of second floor - $76,317
AC installed in existing classrooms - $170,374
New insulation and refinishing on west exterior side of school building - $36,000
School electrical branch panel re-wiring - $1,700

We currently do not have funding for Phase III Projects. Therefore, they will not be addressed until the funding is available.  These projects include:
Tolton Hall demolition - $88,000
Restriping and new landscaping for existing west parking lot in front of church - $28,000
Additional parking lot lighting - $20,000
Parking lot renovation on the east side and connector drive and sidewalks between east and west parking lots - $120,000
South parking lot behind school building and bus/student drop off area - $200,000